Project Description: 90,000 sf of Storage Building, the storage features a Geo-Exchange building designed to serve all HVAC radiant and snow melt systems for the building.
Project Scope: Green Method's scope of work includes geothermal heat pumps installation, ductwork, ventilation, distribution piping, circulating pumping systems and the supply and installation of a geothermal system for radiant heat and snowmelt.
Outcome: After installation and commissioning, the system faced its first test during the onset of the initial snow storms. This trial not only validated the initial design assumptions but also showcase the system's capability to surpass the designed
Project Type:
Geo-Exchange
Client:
Green Storage
Location:
Scarborough